Fume extraction and treatment plant
- Treated air flow rate: 20000 cu m/h
- Installed power: 45 Kw
Coral Engineering Srl drew up the project for the supply of fume extraction and treatment systems resulting from fire resistance tests on materials and artifacts in the naval and civil fields; the supply also includes the design and construction of a mezzanine where the filtration units will be placed, one with cartridges(AIRCOMPACT 07×4-10) for dust and the other with activated carbon(KARB 11 s.v.) for volatile organic substances, chimney for roof evacuation of treated fumes and a pressurized room protection system.
Also included in the works are construction works regarding the design and construction of the reinforced concrete basement where the mezzanine will be placed and the construction works inherent in the resurfacing of the solar slab and facade of the RINA building.